BID- Prime Contracts for John Walton Spencer School No. 16 – Phase 2A.1

Sealed bids will be received until 2:00 p.m. on May 20th, 2020, at the Rochester Schools Modernization Program (RSMP) at 70 Carlson Road, Suite 200, Rochester, NY 14610, by the Rochester Joint Schools Construction Board (“RJSCB” or “Owner”); Attention: Pépin Accilien P.E., Program Director, Tel. 585-512-3820, for the Rochester City School District’s John Walton Spencer School 16 – Phase 2A.1, at which time and place said bids will be publicly opened and read aloud. Questions during the bidding period must be communicated as described in Section 00 21 13 – INSTRUCTIONS TO BIDDERS.

RCSD John Walton Spencer - School No.16, Rochester, NY, Phase 2A.1 (“Project”) includes prime contracts as follows:

• General Trades Work Contract #7                    • Mechanical Work Contract #8
• Electrical Work Contract #9                               • Plumbing Work Contract #10

PLEASE NOTE THAT THE PROJECT DOES NOT INCLUDE A PROJECT LABOR AGREEMENT (PLA) AS A PART OF THE PROJECT DOCUMENTS/REQUIREMENTS.

050620-School 16 Bid Advertisement, Phase 2A.1

SPECIFICATIONS FILES

School 16 Bid Specs- pgs. 1-372, General Conditions

School 16 Bid Specs- pgs. 373-576, RSMP Safety Standards

School 16 Bid Specs, pgs. 577-708, Commissioning Regulations

School 16 Bid Specs, pgs. 709-998, MEP Specifications

School 16 Bid Specs, pgs. 999-1063, Sitework & Paving

DRAWINGS FILES

School 16 Bid Drawings, pgs. 1-8

School 16 Bid Drawings, pgs. 9-15

School 16 Bid Drawings, pgs. 16-22

School 16 Bid Drawings, pgs. 23-29

School 16 Bid Drawings, pgs. 30-36

ADDENDUM #1

BID ADDENDUM NO. 1 - 05.14.20

Contract for the General Construction package at the School No. 16 project (RSMP Phase 2a.1) has been awarded by the RJSCB to DiPasquale Construction Inc.

Contract for the Mechanical package at the School No. 16 project (RSMP Phase 2a.1) has been awarded by the RJSCB to Nairy Mechanical LLC.

Contract for the Electrical package at the School No. 16 project (RSMP Phase 2a.1) has been awarded by the RJSCB to Concord Electric Corporation.

Contract for the Plumbing package at the School No. 16 project (RSMP Phase 2a.1) has been awarded by the RJSCB to Michael A. Ferrauilo Plumbing & Heating.

Comments are closed.